New Machine

#11
ran into a little bit of trouble when trying to pick the mill up to the
sub base. the legs of the hoist are too close together. i need to extend
the hoist arm out so the sub base will fit between the hoist legs. i will
get back on this tomorrow. the base, a few hundred pounds of cast iron,
uses metric screws to attach the mill so i need to run out and get some
bolts too.

20171031_162017.jpg

20171031_162103.jpg

:thumbsup:

phil
 
Top