Well, I wasn't able to completely finish my hydraulic 2x2 bike as I had hoped. I am still hard at work on it, but I ran into a snag trying to fit an oil reservoir and a gas tank in such a small space. I tried pvc tanks, air compressor tanks, harley davidson dual tanks; but nothing fit the way that I want it to.
However, I am glad to say I now have reached a final plan for the tanks, and the bike is still coming together! I will be making dual cylinder tanks out of aluminum which will bolt to the top tube. The parts in transit as I type this.
Thanks to you all, and especially Clayon for hosting the build-off this year. I would have never gotten this far along with my project if I had just done this on my own.
I still plan to continue through to the end of the build, which actually is like a month away- is it possible that the threads can remain open so that I can complete my bike and finish well?
Best Regards,
Darrel Barnette
However, I am glad to say I now have reached a final plan for the tanks, and the bike is still coming together! I will be making dual cylinder tanks out of aluminum which will bolt to the top tube. The parts in transit as I type this.
Thanks to you all, and especially Clayon for hosting the build-off this year. I would have never gotten this far along with my project if I had just done this on my own.
I still plan to continue through to the end of the build, which actually is like a month away- is it possible that the threads can remain open so that I can complete my bike and finish well?
Best Regards,
Darrel Barnette