The frame is done on the CT200U. A little cutting, twisting, squaring, welding and grinding needed to be done in order to finish it. Still needs some paint but I’ll have to heat the shop to do that. The jackshaft mount has been welded in, as well. A new front suspension is being fabbed for it...