This is what I did all day today. TIG weld stainless...
3'' 304 Stainless mandrel bends and straight pipe all hand fitted. Nice tight joints. Lots and lots of time fitting each piece to the next piece. This is the right tailpipe going over the axle.
Those tight joints sacrificed to my lack of TIG talent...
The metal ruler represents the bottom of a floor brace exactly.... We will have to notch the floor brace for both tailpipes and also for the center of the rear axle housing. We will also wrap the tailpipes where they will be close to the floor.
Just a shot from just about ground level. Still have to install the gas tank behind the axle. That is why the tailpipes had to turn out under the frame and then turn back with the resonators. The one tube that runs across under the rear axle will be removed when we take it all apart again for paint.
10 pounds of stuff in a 2 pound sack.....
Doug